Blocking before drywall
Beams, shelves, panelling and built-ins hang on solid wood blocking. It is far easier to add while the walls are open than after they are finished.
Removable panels built and painted to match the wall, so the shut-offs behind them stay reachable.

A built-in panel box framed around plumbing and electrical shut-offs, with removable panels that are fitted, filled and painted to match the walls, so everything behind them can be reached without cutting into a finished wall.
Beams, shelves, panelling and built-ins hang on solid wood blocking. It is far easier to add while the walls are open than after they are finished.
Fill, caulk and paint after the millwork is installed, so every joint is closed and the finish is even from one piece to the next.
Your room designed with you in 3D, each choice priced as you make it, and a written estimate for the scope we agree before we leave. $250 + GST, credited to your project when you go ahead.
Call any time. Every call is answered, day or night.