Moisture first, finishes last
Find and fix any water problem before framing. Insulation and a proper vapour barrier go in before drywall, and the finishes come last, so the space stays dry and warm.
A basement taken back to the foundation and rebuilt as a suite: under-slab plumbing, framing, drywall and paint, ready for its kitchen and bathroom.

The shell of a basement suite. The old walls came out first, then the slab was trenched for new under-slab plumbing, the walls and bulkheads were framed, and the space was boarded, taped, primed and painted.
The order matters in a basement: moisture and insulation come first, then the rough-ins, then the finishes. The suite's kitchen and bathroom have their own pages.
Find and fix any water problem before framing. Insulation and a proper vapour barrier go in before drywall, and the finishes come last, so the space stays dry and warm.
Water shut-offs, cleanouts and junction boxes need to stay reachable. Removable access panels or a suspended ceiling keep them in reach without cutting into a finished wall.
New plumbing, electrical, bedrooms and suites need permits and inspections. Each inspection is a hold point: the walls are closed only after it passes.