Basement suite bathroom: walk-in shower and stacked laundry

Designed in 3D, then built from the studs: a large-format tile walk-in shower with a long niche, bench and linear drain, sliding glass, and a stacked washer and dryer.

Basement suite bathroom: walk-in shower and stacked laundry, photo 1 of 30 (finished)
Finished
From our photo archive: job-site photos taken before our project records, so the job details are not listed.

What the photos show

The bathroom for a basement suite, planned in 3D first so the shower, vanity and a stacked washer and dryer all fit the room. The photos follow it through every stage: the walls opened up and framed, cement board and a sheet waterproofing membrane over every wet surface, a long recessed niche and a tiled bench, large-format tile set with a levelling system, and a linear drain.

The finished room has the tiled walk-in shower behind sliding glass doors, a shower tower, a white vanity, wood-look plank flooring and the laundry stacked beside the shower.

This is the work that decides whether a shower lasts, and it is the same on every bathroom we build.

Design render2 photos

In progress16 photos

Finished12 photos

This room in 3D

Our process starts with a 3D design you walk through with us before anything is ordered. Here is this room as a 3D design, beside the finished job.

3D design of a compact bathroom with a grey tiled shower, sliding glass, a white vanity and a stacked washer and dryer
3D design
3D design: the tiled shower with its bench, long niche and sliding glass, the vanity and the stacked laundry.
Basement suite bathroom: walk-in shower and stacked laundry: the finished room
Finished job
Photo: the finished room, from our job site.

Helpful tips

Ask what goes behind the tile

Tile is not waterproof on its own. Ask any contractor what goes behind it: we put cement board and a bonded sheet membrane on every wet wall, and flood-test every shower floor for 24 hours, with photos, before a single tile is set.

Choose fixtures before the price is final

The valve, drain and vanity size decide where the plumbing goes. Picking them before the price is final means the price is real and nothing has to be moved once the walls are open.

Add blocking while the walls are open

Solid wood blocking behind the toilet, tub and shower walls costs little during the work and means grab bars can be added later without opening a finished wall.

Start with a design consultation

Your room designed with you in 3D, each choice priced as you make it, and a written estimate for the scope we agree before we leave. $250 + GST, credited to your project when you go ahead.