Moisture first, finishes last
Find and fix any water problem before framing. Insulation and a proper vapour barrier go in before drywall, and the finishes come last, so the space stays dry and warm.
An older basement ceiling opened up, the ducts and beams boxed in with framed bulkheads, then boarded, taped and mudded around new lights.

Work in an older basement with a low, busy ceiling: insulation and old ceiling pulled back, the main trunk ducts and beams boxed in with framed bulkheads, and the ceiling furred so it could be boarded flat.
Then drywall over the ceiling and bulkheads, taped and mudded around new light boxes and vents, with the walls primed white and the rooms ready for paint and flooring.
Find and fix any water problem before framing. Insulation and a proper vapour barrier go in before drywall, and the finishes come last, so the space stays dry and warm.
Water shut-offs, cleanouts and junction boxes need to stay reachable. Removable access panels or a suspended ceiling keep them in reach without cutting into a finished wall.
New plumbing, electrical, bedrooms and suites need permits and inspections. Each inspection is a hold point: the walls are closed only after it passes.