Flat starts underneath
Large-format tile needs a flat base. The walls and floor are checked and corrected before tile, and a levelling system holds each tile flat while the thin-set cures.
What goes on behind the tile: cement board, waterproofing membranes, niches and levelled large-format tile.

These photos, from several of our showers, show the stages most people never see: cement board and waterproofing membrane on shower walls, sealed niches, a levelling system holding large-format tile flat while it sets, and the finished walls.
This is the work that decides whether a shower lasts. We photograph it on every job.
Large-format tile needs a flat base. The walls and floor are checked and corrected before tile, and a levelling system holds each tile flat while the thin-set cures.
Grout and tile let water through over time. In wet areas, a bonded sheet membrane over cement board keeps the water out of the walls; it is the same in every tier.
Your room designed with you in 3D, each choice priced as you make it, and a written estimate for the scope we agree before we leave. $250 + GST, credited to your project when you go ahead.
Call any time. Every call is answered, day or night.